It is the same standard series brought to a high level as the Pin shackles does not fall and the entry openning is total.
Ref. | Ø m.m | A m.m | B m.m | Work load kg. | Break load kg. | PCS in a Bag | Bag Weight Kg. |
---|---|---|---|---|---|---|---|
101-I | 4 | 8 | 15 | 450 | 1050 | 50 | 0,370 |
102-I | 5 | 10 | 17 | 600 | 1500 | 50 | 0,700 |
103-I | 6 | 12 | 19 | 1000 | 1800 | 50 | 1,200 |
104-I | 8 | 16 | 30 | 1700 | 4300 | 50 | 3,000 |
105-I | 10 | 20 | 33 | 2500 | 5700 | 25 | 2,750 |
106-I | 12 | 24 | 40 | 3800 | 8000 | 10 | 1,900 |
Ref. | Ø m.m | A m.m | B m.m | Work load kg. | Break load kg. | PCS in a Bag | Bag Weight Kg. |
---|---|---|---|---|---|---|---|
201-I | 4 | 8 | 30 | 400 | 1000 | 50 | 0,525 |
202-I | 5 | 10 | 38 | 600 | 1500 | 50 | 1,020 |
203-I | 6 | 12 | 45 | 900 | 1800 | 50 | 1,700 |
204-I | 8 | 16 | 58 | 1700 | 4300 | 25 | 2,000 |
205-I | 10 | 20 | 70 | 2500 | 5700 | 10 | 1,600 |
Ref. | Ø m.m | A m.m | B m.m | C m.m | Work load kg. | Break load kg. | PCS in a Bag | Bag Weight Kg. |
---|---|---|---|---|---|---|---|---|
301-I | 4 | 8 | 21 | 15 | 300 | 900 | 50 | 0,470 |
302-I | 5 | 10 | 26 | 18 | 500 | 1200 | 50 | 0,900 |
303-I | 6 | 12 | 30 | 21 | 800 | 1700 | 50 | 1,500 |
304-I | 8 | 16 | 36 | 25 | 1300 | 4200 | 25 | 3,400 |
305-I | 10 | 20 | 46 | 31 | 2100 | 5600 | 10 | 2170 |
306-I | 12 | 24 | 55 | 38 | 2600 | 7800 | 10 | 3800 |
Ref | Ø m.m | A m.m | B m.m | Work load kg. | Break load kg. | PCS in a Bag | Bag Weight Kg. |
---|---|---|---|---|---|---|---|
401-I | 4 | 8 | 30 | 400 | 1000 | 50 | 0,525 |
402-I | 5 | 10 | 38 | 600 | 1500 | 50 | 1,020 |
403-I | 6 | 12 | 45 | 900 | 1800 | 50 | 1,700 |
404-I | 8 | 16 | 58 | 1700 | 4300 | 25 | 2,000 |
405-I | 10 | 20 | 70 | 2500 | 5700 | 10 | 1,600 |